Industry Monitor Humanoid Industrial & Cobot AGV / AMR Quadruped Reducers · Servos · Sensors Drones & Autonomy Embodied AI
Robos News
Robotics

Distributed Motion Planning for Multi-Robot Systems under Topological Constraints

arXiv:2610.10065v1 Announce Type: new Abstract: Efficient and distributed coordination of mobile robots is one of the main challenges in multi-robot systems. Topological constraints, often expressed as topological braids, are a popular tool to encode complex coordination patterns between multiple mobile robots, as they offer a compact and abstract representation of the desired qualitative relation between the space-time trajectories of the robots. However, execution of joint motion plans encode

Published October 8, 2026 · Category: Robotics

Overview

arXiv:2610.10065v1 Announce Type: new Abstract: Efficient and distributed coordination of mobile robots is one of the main challenges in multi-robot systems. Topological constraints, often expressed as topological braids, are a popular tool to encode complex coordination patterns between multiple mobile robots, as they offer a compact and abstract representation of the desired qualitative relation between the space-time trajectories of the robots. However, execution of joint motion plans encoded as braid-based topological constraints via distributed controllers is challenging, with existing approaches, generally based on the execution of one braid generator at a time, producing slow and suboptimal trajectories. We propose a distributed controller based on Model Predictive Control (MPC) to efficiently execute braid-based topological specifications. Rather than directly tracking the braid specification, we propose to use winding numbers, which are topological invariants for braids, as a proxy. This has the twofold benefit of converting braids into a continuous function, which can be easily tracked by an MPC controller through an appropriate term in the cost function, and of decoupling the global braid specification into a set of pairwise specifications, which can be tracked distributedly through the solution of only local MPC problems. To maintain global coordination, we propose a consensus-based progress estimation approach, which allows the robots to synchronize their motion toward the desired specification. We validate the proposed approach in simulation and in real-world experiments, where we demonstrate the effectiveness of the proposed approach and the improvement over existing approaches in terms of execution speed and control effort.

Source

Originally published at arxiv.org.

Related Articles

Robos News Newsroom

Robos News reports on robotics research, components, manufacturers, field deployments, and industrial automation worldwide. Tip our newsroom: [email protected]

Email the newsroom →
Reporting standard: Product specifications, deployment counts, and performance claims are attributed to their source. Safety-critical decisions should be based on the applicable technical documentation and validation for the operating environment.
More from News →