Industry Monitor Humanoid Industrial & Cobot AGV / AMR Quadruped Reducers · Servos · Sensors Drones & Autonomy Embodied AI
Robos News
Robotics

Multi-Robot Motions in Milliseconds: Vector-Accelerated Primitives for Sampling-Based Planning

arXiv:2604.23960v2 Announce Type: replace Abstract: In this paper, we extend the recent Vector-Accelerated Motion Planning (VAMP) framework to multi-robot motion planning. We develop two vector-accelerated primitives, multi-robot MotionValidation (MotVal) and FindFirstConflict (FFC), which exploit SIMD parallelism within the multi-robot domain. On pure multi-robot motion validation tests, this achieves over 1415X speedup in validation time. Additionally, we modify a representative set of algori

Published August 7, 2026 · Category: Robotics

Overview

arXiv:2604.23960v2 Announce Type: replace Abstract: In this paper, we extend the recent Vector-Accelerated Motion Planning (VAMP) framework to multi-robot motion planning. We develop two vector-accelerated primitives, multi-robot MotionValidation (MotVal) and FindFirstConflict (FFC), which exploit SIMD parallelism within the multi-robot domain. On pure multi-robot motion validation tests, this achieves over 1415X speedup in validation time. Additionally, we modify a representative set of algorithms to use these new primitives. We evaluate five vector-accelerated multi-robot motion planning (VA-MRMP) algorithms on manipulator, 2D mobile robot, and heterogeneous teams, observing planning speedups over FCL of up to 1492X. With VA-MRMP, all five planners attain subsecond median runtimes on problems with four Panda manipulators.

Source

Originally published at arxiv.org.

Related Articles

Robos News Newsroom

Robos News reports on robotics research, components, manufacturers, field deployments, and industrial automation worldwide. Tip our newsroom: [email protected]

Email the newsroom →
Reporting standard: Product specifications, deployment counts, and performance claims are attributed to their source. Safety-critical decisions should be based on the applicable technical documentation and validation for the operating environment.
More from News →